I anticipate my cerebration at the time was uk rolex replica that the Black-dialed Submariner was so good, it was traveling to be difficult to replica watches argue consumers to get blooming instead of black, or ask them to get in and buy the two. I aswell wish to point out that fake rolex replica watches while the blooming "Hulk" Rolex Submariner 116610LV is not a bound edition, it is not the blazon of watch that replica rolex Rolex will do forever. Its acceptance has kept it in production, but Rolex could stop accomplishing it in blackout at any time after admonishing or reason.

Home   /   Projects   /   Commercial   /   Ecobaazar III, Greater Noida
Ecobaazar III, Greater Noida
Welcome to Ecobaazar III, Greater Noida
Starts From
64,28,565
Shadow
Location
Greater Noida
Shadow
Project Classification
--
Shadow
Completion Date
February 2017
Shadow
Sales Office
ECOBAZAAR III
Plot No. GH - 01, Sector-16 B,
Greater Noida, U.P. (India)
Contact No.: +91-120-4724100
E-mail: ecovillage@supertechlimited.com
Media Gallery
Pre Button Next Button
Floor Plans
Price List
Lower Ground Floor
  CLP/40:30:30 Flexi DPP
Price List (Sq.ft) 18810 17869.5 16929
(Sq.mtr) 202470.84 192347.298 182223.756
Ground Floor
  CLP/40:30:30 Flexi DPP
Price List (Sq.ft) 19800 18810 17820
(Sq.mtr) 213127.2 202470.84 191814.48
First Floor
  CLP/40:30:30 Flexi DPP
Price List (Sq.ft) 14850 14107.5 13365
(Sq.mtr) 159845.4 151853.13 143860.86
Additional Charges 
Particulars Cost
Road Facing  250/-
Corner Facing  250/-
Lease Rent 350/-
IFMS 40/-
EDC/IDC 40/-
FFC 70/-
Electricity Charges (Mandatory)Min 2 KVA 40000/-
Power Backup Charges (per KVA) Rs.20000/-
Payment Plan
[A] Down Payment Plan
S. No. Particulars Percentage
1. At the time of booking 10 %
2. Within 30 days from booking 85 %
3. On offer of possession 05 %
[B] Flexi Payment Plan
S. No. Particulars Percentage
1. At the time of booking 10 %
2. Within 60 days of booking 30 %
3. On completion of foundation 20 %
4. On completion of lower ground floor 20%
5. On completion of ground floor 10 %
6. On offer of possession 10 %
[C] Construction Linked Plan
S. No. Particulars Percentage
1. At the time of booking 10%
2. Within 30 days from booking 15%
3. Within 60 days from booking 15%
4. On completion of foundation work 10%
5. On completion of lower ground floor 10%
6. On completion of ground floor 10%
7. On completion of first floor 10%
8. On brickwork 10%
9. On possession 10%
Enquiry Form
I am interested in this project
spacer
spacer
Location Map
Eco Village 2
Toll Free 1800 103 7676