Cape Town, Noida
Welcome to Cape Town, Noida
Starts From
Rs. 51,68,940
Location
Sector-74,
Noida (U.P.)
EMI Starts from
Rs. 43,129
Completion Date
Late 2014

A world-class leisure and residential community spread out over approx 50 sprawling acres, CapeTown has been envisioned as a complete, self-contained campus area built around the best of the facilities where every home is designed to the most demanding standards.

8 Variants of well planned (2,3,4 bedroom) apartments and penthouse towers, Luxury Villas spread over a green area, CapeTown from Supertech is one of the best housing developments in the city.'

CapeTown will comprise of upscale, well appointed apartments with modern conveniences such as a clubhouse, jogging track, swimming pool and more.

Loans Approved by

 

Sales Office
Supertech Cape Town
Plot No. GH-01/A, Sector-74,
Noida, U.P.
Contact: +91-120-4724100
E-mail: capetown@supertechlimited.com
Features
What's Special

Clubhouse

Coffee Bar

Gymnasium

Parking

Swimming Pool

CCTV Surveillance

Play Area

Hi-speed Elevators

Power Back-up

Open Landscape

Jogging Track

Party Lawn
  • 2/3/4 BHK, 3 side open premium residences
  • East –West Aligned Apartments
  • Spread over 10 acres of sprawling greens
  • No High Rise construction between Araville range and project
  • Panoramic views of the Araville green range
  • Dedicated kid zones with ultra modern facilities
  • Automated smart homes with high ceilings
  • Furnished Apartments having Modular Kitchen, Wardrobes, Split A/Cs in Master bedroom & Living Room
  • Exclusive club house with ultra modern facilities
  • Underground car parking with life facility
  • Imported Marble Flooring etc.
  • Hi-tech security systems
  • Signature Tower only 22 km
  • Approximately 23 km from Iffco Chowk
  • Airport- 35 km
Media Gallery
Get Direction
Site Plan
Roll Over to Enlarge
Floor Plans
2 BHK Type A [ 2 Bedrooms, 2 Toilets, Kitchen, 3 Balconies, Super Area - 930 Sq Ft ]
Super Area - 930 Sq Ft

Living cum Dining
17"-1" x 10"-0"

Bedroom
10"-0" x 11"-0"
11"-0" x 10"-0"

3 Balconies

2 Toilets

Kitchen
5'-0"x8'-9"
2 BHK Type B [ 2 Bedrooms, 2 Toilets, Kitchen, Dining, 3 Balconies, Super Area - 1082 Sq Ft ]
Super Area - 1082 Sq Ft

Living cum Dining
18'-3"x11'-0"

Bedroom
10'-6"x13'-0"
11'-0"x10'-6"

3 Balconies

2 Toilets

Kitchen
6'-0"x9'-9"
2 BHK + Study Type C [ 2 Bedrooms, 2 Toilets, Study, Kitchen, Dining, 5 Balconies, Super Area - 1150 Sq Ft ]
Super Area - 1150 Sq Ft

Living cum Dining
17'-0"x11'-0"

Bedroom
12'-0"x11'-0"
10'-0"x12'-0"

Study Room
8'-0"x9'-0"

Kitchen
6'-0"x9'-9"

2 Toilets

5 Balconies
3 BHK Type A [ 3 Bedrooms, 2 Toilets, Kitchen, Dining, 3 Balconies, Super Area - 1295 Sq Ft ]
Super Area - 1295 Sq Ft

Living cum Dining
17'-6"x11'-0"

Bedroom
13'-0"x11'-0"
10'-0"x10'-0"
12'-0"x10'-6"

Kitchen
9'-6"x6'-0"

2 Toilets

3 Balconies
3 BHK Type B [ 3 Bedrooms, 2 Toilets, Kitchen, Dining, 4 Balconies, Super Area - 1505 Sq Ft ]
Super Area - 1505 Sq Ft

Drawing
10'-6"x15'-6"

Dining
10'-0"x10'-6"

Bedroom
13'-0"x11'-0"
10'-0"x12'-0"
12'-0"x10'-6"

Store Room
5'-6"x5'-0"

Kitchen
9'-6"x6'-0"

2 Toilets

4 Balconies
3 BHK Type C [ 3 Bedrooms, 3 Toilets, Kitchen, Dining, 3 Balconies, Super Area - 1625 Sq Ft ]
Super Area - 1625 Sq Ft

Drawing
16'-4"x11'-2"

Dining
9'-0"x10'-5"

Bedroom
14'-0"x11'-2"
10'-0"x13'-0"
10'-0"x12'-0"

Kitchen
7'-0"x10'-0"

3 Toilets

3 Balconies
3 BHK + Study Type D [ 3 Bedrooms, 4 Toilets + Kitchen, Dining, Study, 3 Balconies, Super Area - 1945 Sq Ft ]
Super Area - 1945 Sq Ft

Drawing
17'-0"x11'-2"

Dining
9'-0"x11'-0"

Bedroom
14'-0"x11'-2"
10'-0"x13'-0"
10'-0"x12'-0"

Study Room
7'-0"x10'-0"

Kitchen
7'-0"x10'-0"

3 Toilets

3 Balconies
4 BHK + SQ [ 4 Bedrooms, 4 Toilets, Kitchen, Dining, 4 Balconies, Servant Room, Super Area - 2385 Sq Ft ]
Super Area - 2385 Sq Ft

Drawing Room
11'-0"x17'-0"

Dining Room
13'-4"x12'-0"

4 Bedroom
16'-6"x12'-0"
10'-6"x12'-0"
10'-6"x11'-0"
11'-6"x13'-0"

Servant Room
7'-0"x7'-9"

Kitchen
10'-0"x8'-0"

5 Toilets

4 Balconies
Specifications
Living Room
Floor: Vitrified Tiles
External Door and Window: Powder Coated Aluminum With Double Rebate
Electrical Fittings: Sheet and Switches
Walls: Oil Bound Distemper
Internal Door: Flush Shutter with Wooden Frame
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Ceilings: Oil Bound Distemper
Dining
Floor: Vitrified Tiles
External Door and Window: Powder Coated Aluminum With Double Rebate
Electrical Fittings: Sheet and Switches
Walls: Oil Bound Distemper
Internal Door: Flush Shutter with Wooden Frame
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Ceilings: Oil Bound Distemper
Bedroom
Floor: Vitrified Tiles
External Door and Window: Powder Coated Aluminum With Double Rebate
Electrical Fittings: Sheet and Switches
Walls: Oil Bound Distemper
Internal Door: Flush Shutter with Wooden Frame
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Ceilings: Oil Bound Distemper
Master Bedroom
Floor: Vitrified Tiles
External Door and Window: Powder Coated Aluminum With Double Rebate
Electrical Fittings: Sheet and Switches
Walls: Oil Bound Distemper
Internal Door: Flush Shutter with Wooden Frame
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Ceilings: Oil Bound Distemper
Dressing Room
Floor: Vitrified Tiles
External Door and Window: Powder Coated Aluminum With Double Rebate
Electrical Fittings: Sheet and Switches
Walls: Oil Bound Distemper
Internal Door: Flush Shutter with Wooden Frame
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Ceilings: Oil Bound Distemper
Servant Room
Floor: Ceramic Tiles
External Door and Window: Powder Coated Aluminum With Double Rebate
Electrical Fittings: Sheet and Switches
Walls: Oil Bound Distemper
Internal Door: Flush Shutter with Wooden Frame.
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Ceilings: Oil Bound Distemper
Kitchen
Floor: Vitrified Tiles
External Door and Window: Powder Coated Aluminum With Double Rebate
Electrical Fittings: Sheet and Switches
Walls: Ceramic tiles of 7" heights
Fittings: Stain steel Sink with C.P.Fittings Full Modular Kitchen with RO System
Internal Door: Open
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Ceilings: Oil Bound Distemper
Toilet
Floor: Ceramic Tiles
Electrical Fittings: Sheet and Switches
Walls: Ceramic tiles of 7" heights
Fittings: Washbasin WC & C.P. Fittings
Internal Door: Flush Shutter
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Ceilings: Flase Ceiling
Balconies
Floor: Ceramic Tiles
Electrical Fittings: Sheet and Switches
Walls: Oil Bound Distemper
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Ceilings: Permanent paint Finish
Lift
Floor: PVC Flooring
Electrical Fittings: Sheet and Switches
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Lobbies/Corridor
Floor: Kota Stone/Veritified Tiles
Walls: Oil Bound Distemper
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Exterior Room
Walls: Texture Paint
Internal Door: Flush Shutter with Wooden Frame
Hardware: All Doors and windows with metal fittings along with mort ice lock on the main door
Electrical: Cooper wiring and PVC Concealed conduit, Provision for adequate light an d power points as well as television and TV outlets with modular switches and protective M.C.B's.
Water Supply: Underground and Overhead water tanks with pumps and 24 hours water supply. Individual R.O plant Standard make in each kitchen.
Price List
[A] Basic Sales Prices
Accommodation
Type
Super Area
(In Sq. Ft.)
SPP @
Rs. 5850/-Sq. Ft.
DPP @
Rs. 5558/- Sq. Ft.
2 BHK 930 5440500 5168940
2 BHK 1082 6329700 6013756
2 BHK + Study 1150 6727500 6391700
3 BHK 1295 7575750 7197610
3 BHK 1505 8804250 8364790
3 BHK 1625 9606250 9031750
3 BHK + Study 1945 11378250 10810310
4 BHK + SQ 2385 13952250 13255830
[B] Other Charges (One Time)
S. No. Particulars
1. Covered Car Parking (Per Slot): Rs.400000/-
2. Club Membership: Rs.100000/-
3. Electricity Installation Charges: Rs 20000/- (2kw Mandatory)
4. Power Backup Charges Rs 20000/- (1kw Mandatory)
5. Lease Rent Charges: Rs.150/- per Sq.Ft.
6. IFMS (on offer of possession): Rs 50/- per Sq.Ft.
[C] Preferential Location Charges
Floor PLC Rs. per Sq.Ft. Location PLC Rs. per Sq.Ft.
Ground Floor 250 Corner Flat 50
1st to 3rd Floor 200 Park Facing 50
4th to 6th Floor 150 Road Facing 50
7th to 9th Floor 100 - -
10th to 11th Floor 50 - -
Payment Plan
[A] Special Payment Plan
S. No. Particulars Percentage
1. At the time of Booking 10%
2. Within 30 days from booking 15%
3. Within 60 days from booking 15%
4. On offer of possession letter 60%
[B] Down Payment Plan
S. No. Particulars Percentage
1. At the time of booking 10%
2. Within 30 days from booking 85%  + 100% (L.R. + C.C.P. + C.M. IFMS)
3. On offer of possession letter 05% + Other Charges

LR = Lease Rent
CCP = Covered Car Parking
CM = Club Membership

Terms and Conditions
  • Price list as on date of booking shall be applicable.
  • PLCs if any shall be charged along with installations towards basic cost.
  • Cheques/Bank Drafts to be issued in favour of 'SUPERTECH LIMITED' payable at New Delhi/Noida. Out station cheques shall not be accepted.
  • Service tax. VAT & other government levies are extra, as applicable.
  • Registration, Stamp Duty and misc. charges shall be payable at the time of Offer of Possession.
  • Super Area includes the covered area plus the proportionate area under Common Corridor, Passages, Staircases, Mumties, Projections, Water Tanks, Lift Wells, etc.
  • The terms and condition of sale stated herein are indicative and are subject to detailed terms & conditions in the 'Agreement to Sell' / 'Flat Buyers Agreement1 and are subject to change at sole discretion of the company.
  • All building plans, layouts, specifications are subject to changes and modifications as decided by the company, architect or any other competent authority.
  • Timely payments of the installments is the essence of the Booking.
  • This Price List supercedes all previous price lists
Progress Status
Phase I
Tower Expected Possession Current Status
CS3 Late 2014 Structure Completed, Finishing Work in Progress
CG1 Late 2014 Structure Completed, Finishing Work in Progress
CB1 Late 2014 Structure Completed, Finishing Work in Progress
CS1 Early 2015 Structure Completed, Finishing Work in Progress
CV1 Early 2015 Structure Completed, Finishing Work in Progress
CV2 Late 2014 Structure Completed, Finishing Work in Progress
CV3 Early 2015 Structure Completed, Finishing Work in Progress
CV4 Late 2014 Structure Completed, Finishing Work in Progress
CMC2 Late 2014 Structure Completed, Finishing Work in Progress
CG3 Early 2015 Structure Completed, Finishing Work in Progress
CB2 Late 2014 Structure Completed, Finishing Work in Progress
CB3 Early 2015 Structure Completed, Finishing Work in Progress
Phase II
Tower Expected Possession Current Status
CM3 Early 2015 Structure Completed, Finishing Work in Progress
CM4 Early 2015 Structure Completed, Finishing Work in Progress
CS10 Early 2015 Structure Completed, Finishing Work in Progress
CMC3 Early 2015 Structure Completed, Finishing Work in Progress
CMC4 Early 2015 Structure Completed, Finishing Work in Progress
CS9 Early 2015 Structure Completed, Finishing Work in Progress
CS7 Early 2015 Structure Completed, Finishing Work in Progress
CS6 Early 2015 Structure Completed, Finishing Work in Progress
CS5 Late 2015 Structure Completed, Finishing Work in Progress
CS4 Early 2015 Structure Completed,Finishing Work in Progress
CG4 Early 2015 Structure Completed, Finishing Work in Progress
CG5 Early 2015 Structure Completed, Finishing Work in Progress
CV5 Early 2015 Structure Completed, Finishing Work in Progress
Phase III
Tower Expected Possession Current Status
CM2 Early 2015 Structure Completed, Finishing Work in Progress
CMC1 Late 2015 Structure Completed, Finishing Work in Progress
CG2 Early 2015 Structure Completed, Finishing Work in Progress
CS2 Early 2015 Structure Completed, Finishing Work in Progress
CM1 Early 2015 Structure Completed, Finishing Work in Progress
CS8 Late 2015 Structure Completed, Finishing Work in Progress
CG6 Early 2015 Structure Completed, Finishing Work in Progress
CV7 Early 2015 Structure Completed, Finishing Work in Progress
CGD1 Mid 2015 Structure Completed, Finishing Work in Progress
CC1 Early 2015 19th floor slab work completed
CC2 Early 2015 19th floor slab work completed
CS12 Mid 2015 Structure Completed, Finishing Work in Progress