Home &bsp; /   Projects   /   Residential   /   Ecovillage, Greater Noida (West)
Ecovillage, Greater Noida (West)
Welcome to Ecovillage, Greater Noida (West)
Starts From
Rs. 22,37,716
Location
Greater Noida (West)
EMI Starts from
Rs. 17,573
Completion Date
Late 2014

Eco-village is not just a landmark on the map, but also on your personal journey. Just like your first job, first promotion and first car. It combines the expertise of Supertech with a plush location like Noida and affordable prices so that you can enjoy the living experience that is very much your right. Some features will make you want it right now:

Connectivity-Close proximity to important industrial and residential areas like Greater Noida, Noida and Ghaziabad.

4-sided open campus-- The 50 acre campus is open on all 4 sides, all well connected by roads.

Loans Approved by
Sales Office
ECOVILLAGE
Plot No. 8, Sector-1,
Greater Noida, U.P. (India)
Contact: +91-120-4724100
E-mail: ecovillage@supertechlimited.com
Features
What's Special

Clubhouse

Coffee Bar

Gymnasium

Parking

Swimming Pool

CCTV Surveillance

Play Area

Hi-speed Elevators

Power Back-up

Open Landscape

Jogging Track

Party Lawn
  • 80% open landscaped area
  • 3 sided open vastu friendly Plot
  • In-house clubs with exclusive facilities
  • 24 hour water & power supply
  • Vaastu friendly fengshui layout & design
  • Combination of Low-rise and High-rise buildings
  • Swimming pool, Health Club, Medical Centre, Ayurvedic Massage Centre
  • Badminton Court, Tennis Court & Amphitheatre
  • Round the clock customer care
  • Reticulated gas supply to every kitchen
  • Shopping complex with in the complex
  • Ample parking space
  • Well-designed complex with beautiful landscape
  • Earthquake Resistance R.C.C. frame structure & non-load bearing brick walls
  • Intercom facility in all flats connected with security room and administration office
  • Guard room at main Entrance for Efficient manual
  • Recycle bin All around the campus
  • In house garbage/sewage treatment plan
  • CNG operated power backup generation
Media Gallery
Click  
 to Get 360 degree view of construction site from various points
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Get Direction
Site Plan
Roll Over to Enlarge
Floor Plans

Ecovillage comprises of 1, 2, 3 and 4 Bedrooms apartments, area of which range between 598 Sq. Ft. to 2364 Sq. Ft. Floor plans are 3-4 sided open and artistically vastu friendly designed.

1 BHK [ 1 Bedrooms, Super Area - 598 Sq Ft ]
Super Area - 598 Sq Ft

Drawing
10'-6"x12'-0"

Bedrooms
10'-0"x10'-6"

Kitchen
5'-0"x7'-0"

1 Toilet

2 Balconies
2 BHK [ 2 Bedroom, 2 Toilet, Kitchen, Dining, Drawing, 3 Balconies, Super Area - 890 Sq Ft ]
Super Area - 890 Sq Ft

Drawing/Dining
10'-0"x16'-0"

2 Bedrooms
10'-0"x10'-0"
10'-0"x11'-0"

Kitchen
5'-6"x8'-0"

2 Toilet

3 Balconies
2 BHK [ 2 Bedroom, 2 Toilet, Kitchen, Dining, Drawing, 3 Balconies, Super Area - 1106 Sq Ft ]
Super Area - 1106 Sq Ft

Drawing/Dining
11'-0"x18'-3"

2 Bedrooms
11'-0"x13'-0"
11'-0"x10'-6"

Kitchen
7'-0"x9'-0"

2 Toilet

3 Balconies
3 BHK [ 3 Bedrooms, 2 Toilets, Kitchen, Dining, Drawing, 4 Balconies, Super Area - 1267 Sq Ft ]
Super Area - 1267 Sq Ft

Drawing/Dining
10'-6"x17'-6"

3 Bedrooms
10'-0"x12'-0"
10'-0"x10'-0"
10'-6"x11'-0"

Kitchen
8'-6"x7'-0"

2 Toilet

3 Balconies
3 BHK [ 3 Bedrooms, 2 Toilets, Super Area - 1375 Sq Ft ]
Super Area - 1375 Sq Ft

Drawing/Dining
10'-6"x22'-5"

3 Bedrooms
13'-0"x11'-6"
11'-0"x10'-0"
12'-0"x10'-0"

Kitchen
6'-0"x9'-0"

2 Toilet

4 Balconies
3 BHK [ 3 Bedroom, Dress Room, 2 Toilet, Kitchen, Dining, Drawing, 3 Balconies, Super Area - 1464 Sq Ft ]
Super Area - 1464 Sq Ft

Drawing/Dining
11'-0"x19'-6"

3 Bedrooms
11'-0"x13'-0"
10'-6"x12'-0"
11'-0"x10'-0"

Dressing
5'-0"x4'-6"

Kitchen
9'-6"x7'-6"

2 Toilet

3 Balconies
3 BHK [ 3 Bedrooms, 2 Toilets, Dining, Super Area - 1545 Sq Ft ]
Super Area - 1545 Sq Ft

Drawing
10'-6"x17'-0"

Dining
9'-6"x10'-0"

3 Bedrooms
14'-0"x11'-0"
10'-0"x11'-0"
11'-0"x12'-0"

Kitchen
9'-6"x7'-0"

2 Toilet

4 Balconies
3 BHK [ 3 Bedroom, 3 Toilet, Kitchen, Dining, Drawing, 4 Balconies, Super Area - 1718 Sq Ft ]
Super Area - 1718 Sq Ft

Drawing
11'-0"x15'-0"

Dining
10'-6"x11'-0"

3 Bedrooms
14'-0"x11'-0"
10'-6"x12'-0"
11'-0"x13'-0"

Kitchen
10'-6"x7'-6"

3 Toilet

4 Balconies
3 BHK [ 3 Bedroom, 3 Toilet, Kitchen, Dining, Drawing, 3 Balconies, Servant Room, Super Area - 1906 Sq Ft ]
Super Area - 1906 Sq Ft

Drawing
15'-0"x11'-0"

Dining
11'-0"x10'-6"

3 Bedrooms
11'-0"x14'-0"
12'-0"x10'-6"
13'-0"x11'-0"

Kitchen
7'-6"x10'-6"

3 Toilet

3 Balconies
4 BHK [ 4 Bedroom, Dress Room, 3 Toilet, Kitchen, Dining, Drawing, 4 Balconies, Servant Room, Super Area - 2364 Sq Ft ]
Super Area - 2364 Sq Ft

Entrance Lobby
11'-6"x7'-4"

Drawing
16'-0"x11'-4"

Dining
10'-6"x12'-0"

3 Bedrooms
11'-0"x14'-0"
11'-0"x10'-6"
10'-6"x13'-0"
10'-6"x14'-4"

Dressing
7'-2"x5'-0"

Servant Room
5'-7"x10'-6"

Kitchen
7'-6"x10'-6"

4 Toilet

4 Balconies
Specifications

Ecovillage comprises of 1, 2, 3 and 4 Bedrooms apartments, area of which range between 598 Sq. Ft. to 2364 Sq. Ft. Floor plans are 3-4 sided open and artistically vastu friendly designed.

Living Room
Floor: Vitrified tiles
External Door and Window: Aluminium with Double Rebate
Electrical Fitting: Sheets and Switches
Walls: Oil Bound Distemper
Internal Door: Flash shutter with Wooden Frame
Ceiling: Oil Bound Distemper
Dinning
Floor: Vitrified tiles
External Door and Window: Aluminium with Double Rebate
Electrical Fitting: Sheets and Switches
Walls: Oil Bound Distemper
Internal Door: Flash shutter with Wooden Frame
Ceiling: Oil Bound Distemper
Bed Room
Floor: Vitrified tiles
External Door and Window: Aluminium with Double Rebate
Electrical Fitting: Sheets and Switches
Walls: Oil Bound Distemper
Internal Door: Flash shutter with Wooden Frame
Ceiling: Oil Bound Distemper
Master Bedroom
Floor: Vitrified tiles
External Door and Window: Aluminium with Double Rebate
Electrical Fitting: Sheets and Switches
Walls: Oil Bound Distemper
Internal Door: Flash shutter with Wooden Frame
Ceiling: Oil Bound Distemper
Dressing Room
Floor: Vitrified tiles
External Door and Window: Aluminium with Double Rebate
Electrical Fitting: Sheets and Switches
Walls: Oil Bound Distemper
Internal Door: Flash shutter with Wooden Frame
Ceiling: Oil Bound Distemper
Servant Room
Floor: Vitrified tiles
External Door and Window: Aluminium with Double Rebate
Electrical Fitting: Sheets and Switches
Walls: Oil Bound Distemper
Internal Door: Flash shutter with Wooden Frame
Ceiling: Oil Bound Distemper
Kitchen
Floor: Vitrified tiles
External Door and Window: Aluminium with Double Rebate
Electrical Fitting: Sheet and Switches
Walls: Ceremic Tiles of 2' height from the platform
Fittings: Stainless Steel Sink with C.P. Fitting
Internal Door: Open
Ceiling: Oil Bound Distemper
Toilet
Floor: Ceramic Tiles
Electrical Fitting: Sheet and Switches
Walls: Ceremic Tiles of 7' height
Fitting: Washbasin WC and C.P. Fittings
Internal Door: Flash Shutter
Ceiling: False Ceiling
Balconies
Floor: Ceramic Tiles
Electrical Fitting: Sheet and Switches
Walls: Oil Bound Distemper
Ceiling: Permanent Paint Finish
Lift
Floor: P.V.C. Flooring
Electrical Fitting: Sheet and Switches
Lobbies / Corridors
Floor: Kota Stone / Vitrified Tiles
Wall: Oil Bound Distemper
Exterior Finish
Wall: Texture Paint
Internal Door: Flush Shutter with Wooden Frame
Others
Hardware: All doors and windows with metal fittings along with mortice lock on the main door
Electrical: Cooper wiring and PVC concealed conduit. Provision for adequate light and power points as well as Television and T.V. outlets with modular switches and protective M.C.B.'s
Water Supply: Underground and overhead water tanks with pumps and 24 hours water supply. Individual R.O plant of standard make in each kitchen
Price List
[A] Down Payment Plan
Accommodation Type  Unit Size Basic Sale Price  Total Price in Rs. 
in sq.ft. in sq.mt.  per sq.ft. per sq.mt. 
1 BHK 598 55.56 3742 40278.57 2237716
2 BHK 890 82.68 3742 40278.57 3330380
2 BHK 1106 102.75 3742 40278.57 4138652
3 BHK 1267 117.71 3742 40278.57 4741114
3 BHK 1375 127.74 3742 40278.57 5145250
3 BHK 1464 136.01 3742 40278.57 5478288
3 BHK 1545 143.54 3506 37738.29 5416770
3 BHK 1718 159.61 3506 37738.29 6023308
3 BHK + Servant 1906 177.07 3506 37738.29 6682436
4 BHK + Servant 2364 219.62 3506 37738.29 8288184
[B] Flexi Payment Plan
Accommodation Type  Unit Size Basic Sale Price  Total Price in Rs. 
in sq.ft. in sq.mt.  per sq.ft. per sq.mt. 
1 BHK 598 55.56 3950 42517.46 2362100
2 BHK 890 82.68 3950 42517.46 3515500
2 BHK 1106 102.75 3950 42517.46 4368700
3 BHK 1267 117.71 3950 42517.46 5004650
3 BHK 1375 127.74 3950 42517.46 5431250
3 BHK 1464 136.01 3950 42517.46 5782800
3 BHK 1545 143.54 3700 39826.49 5716500
3 BHK 1718 159.61 3700 39826.49 6356600
3 BHK + Servant 1906 177.07 3700 39826.49 7052200
4 BHK + Servant 2364 219.62 3700 39826.49 8746800
[C] Construction Linked Payment Plan
Accommodation Type  Unit Size Basic Sale Price  Total Price in Rs. 
in sq.ft. in sq.mt.  per sq.ft. per sq.mt. 
1 BHK 598 55.56 4158 44756.36 2486484
2 BHK 890 82.68 4158 44756.36 3700620
2 BHK 1106 102.75 4158 44756.36 4598748
3 BHK 1267 117.71 4158 44756.36 5268186
3 BHK 1375 127.74 4158 44756.36 5717250
3 BHK 1464 136.01 4158 44756.36 6087312
3 BHK 1545 143.54 3895 41925.45 6017775
3 BHK 1718 159.61 3895 41925.45 6691610
3 BHK + Servant 1906 177.07 3895 41925.45 7423870
4 BHK + Servant 2364 219.62 3895 41925.45 9207780
[D] Subvention Payment Plan
Accommodation Type  Unit Size Basic Sale Price  Total Price in Rs. (sqmtr)
in sq.ft. in sq.mt.  per sq.ft. per sq.mt. 
1 BHK 598 55.56 3950 42517.46 2362100
2 BHK 890 82.68 3950 42517.46 3515500
2 BHK 1106 102.75 3950 42517.46 4368700
3 BHK 1267 117.71 3950 42517.46 5004650
3 BHK 1375 127.74 3950 42517.46 5431250
3 BHK 1464 136.01 3950 42517.46 5782800
3 BHK 1545 143.54 3700 39826.49 5716500
3 BHK 1718 159.61 3700 39826.49 6356600
3 BHK + Servant 1906 177.07 3700 39826.49 7052200
4 BHK + Servant 2364 219.62 3700 39826.49 8746800
[E] Special Payment Plan
Accommodation Type  Unit Size Basic Sale Price  Total Price in Rs. (sqmtr)
in sq.ft. in sq.mt.  per sq.ft. per sq.mt. 
1 BHK 598 55.56 3950 42517.46 2362100
2 BHK 890 82.68 3950 42517.46 3515500
2 BHK 1106 102.75 3950 42517.46 4368700
3 BHK 1267 117.71 3950 42517.46 5004650
3 BHK 1375 127.74 3950 42517.46 5431250
3 BHK 1464 136.01 3950 42517.46 5782800
3 BHK 1545 143.54 3700 39826.49 5716500
3 BHK 1718 159.61 3700 39826.49 6356600
3 BHK + Servant 1906 177.07 3700 39826.49 7052200
4 BHK + Servant 2364 219.62 3700 39826.49 8746800
[F] Other Charges (One Time)
Particulars Cost
IFMS Rs. 25/sq.ft.
Covered Car Parking (Mandatory) Rs. 2,50,000
Club Membership Rs. 1,00,000
Electricity Installation Charges (2 kW Mandatory) Rs. 20,000/kW
Power Back-up Charges (1 kW Mandatory) Rs. 20,000/kW
Lease Rent Rs. 85/sq.ft.
[G] Preferential Location Charges
Location Cost/sq.ft.
Ground Floor Rs. 250
1st & 3rd Floor Rs. 200
4th to 6th Floor Rs. 150
7th to 9th Floor Rs. 100
10th & 11th Floor Rs. 50
Corner Flat Rs. 50
Park Facing Rs. 50
Road Facing Rs. 50
Payment Plan
[A] Down Payment Plan
S. No. Particulars Percentage
1. At the time of booking 10 %
2. Within 30 days from booking 85 %
3. On offer of possession 05 %
[B] Flexi Payment Plan
S. No. Particulars Percentage
1. At the time of booking 10 %
2. Within 60 days of booking 40 %
3. On completion of foundation 09 %
4. On casting of basement slab 09 %
5. On casting of second floor slab 09 %
6. On casting of fifth floor slab 09 %
7. On casting of eighth floor slab 09 %
8. On offer of possession 05 %
[C] Construction Linked Payment Plan
S. No. Particulars Percentage
1. At the time of booking 10 %
2. Within 30 days of booking 10 %
3. On commencement of foundation 10 %
4. On casting of basement slab 08 %
5. On casting of second floor slab 08 %
6. On casting of fifth floor slab 08 %
7. On casting of eighth floor slab 08 %
8. On casting of twelfth floor slab 08 %
9. On casting of fourteenth floor slab 08 %
10. On brickwork 05 %
11. On interior plaster 06 %
12. On flooring and tiles 06 %
13. On offer of possession 05 %
Terms and Conditions
  • Price list as on date of booking shall be applicable.
  • PLCs if any shall be charged alongwith installments towards basic cost.
  • Cheques/Bank Drafts to be issued in favor of "SUPERTECH LIMITED" payable at New Delhi. Outstation cheques shall not be accepted.
  • Electricity Installation Charges, Maintenance Charges, Meter Connection Charges and other charges are extra and shall be collected before the possession.
  • Service Tax, VAT & other government levies are extra, as applicable.
  • Registration, Stamp Duty and other charges shall be payable at the time of offer of possession.
  • The Super Area include the covered area plus the proportionate area under common corridor, passages, staircase, Mumties, Projections, Water Tanks, lift wells etc.
  • The terms and condition of sale herein are indicative and are subject to detailed terms and condition in the ‘Agreement to sell’ / ‘Flat Buyer’s Agreement’ and are subject to change at sole discretion of the company.
  • All buildings plans, layouts, specifications are subject to changes and modification as decided by the company, architect or any other competent authority.
  • Timely payments of the installments are the essence of the Agreement.
  • This price list supercedes all previous price lists.
Progress Status
Phase I
Tower Expected Possession Current Status
A-1P Mar-15 Under Possession
A-1Q Mar-15 Under Possession
A-1R Mar-15 Under Possession
A-4 Possession Started Under Possession
B-4 Oct-15 Structure Completed,Finishing Work in progress
B-5 Aug-15 Structure Completed,Finishing Work in progress
B-6 Sep-15 Structure Completed,Finishing Work in progress
C-4 Oct-15 Structure Completed,Finishing Work in progress
C-5 Sep-15 Structure Completed,Finishing Work in progress
D-3 Sep-15 Structure Completed,Finishing Work in progress
B-3 Feb-16 Structure Completed,Finishing Work in progress
D-2 Feb-16 Structure Completed,Finishing Work in progress
D-4 Aug-15 Structure Completed,Finishing Work in progress
E-4 Nov-15 Structure Completed,Finishing Work in progress
E-5 Sep-15 Structure Completed,Finishing Work in progress
Phase II
Tower Possession Date Current Status
B-1 May-16 Structure Completed,Finishing Work in progress
B-2 May-16 20th floor slab work completed
A-2X Nov-15 Structure Completed,Finishing Work in progress
A-2Y Nov-15 Structure Completed,Finishing Work in progress
A-2Z Mar-16 17th floor slab work completed
A-3M Mar-16 17th floor slab work completed
A-3N Mar-16 17th floor slab work completed
B-11 Mar-16 Structure Completed,Finishing Work in progress
B-12 Mar-16 18th floor slab work completed
B-12A Mar-16 16th floor slab work completed
B-14 Feb-16 17th floor slab work completed
B-15 Dec-15 Structure Completed,Finishing Work in progress
B-16 Dec-15 Structure Completed,Finishing Work in progress
B-17 Dec-15 Structure Completed,Finishing Work in progress
B-8 Dec-15 Structure Completed,Finishing Work in progress
B-9 May-16 Structure Completed,Finishing Work in progress
B-10 May-16 Structure Completed,Finishing Work in progress
B-18 Dec-15 Structure Completed,Finishing Work in progress
C-2 Jun-16 15th floor slab work completed
C-3 Jun-16 15th floor slab work completed
E-1 Mar-16 Structure Completed,Finishing Work in progress
F-1 Nov-15 Structure Completed,Finishing Work in progress
G-1 Nov-15 Structure Completed,Finishing Work in progress
Phase III
Tower Possession Date Current Status
D-5 May-16 Structure Completed,Finishing Work in progress
E-6 May-16 Structure Completed,Finishing Work in progress
E-7 May-16 Structure Completed,Finishing Work in progress
F-7 Dec-15 Structure Completed,Finishing Work in progress
F-5 Dec-15 Structure Completed,Finishing Work in progress
G-5 Dec-15 Structure Completed,Finishing Work in progress
N-1 Dec-15 Structure Completed,Finishing Work in progress
N-2 Mar-16 Structure Completed,Finishing Work in progress
N-3 Mar-16 20th floor slab work completed
S-1 Dec-15 Structure Completed,Finishing Work in progress
S-2 May-16 Structure Completed,Finishing Work in progress
S-3A May-16 Structure Completed,Finishing Work in progress
S-3B May-16 Structure Completed,Finishing Work in progress
C-6 Mar-16 19th floor slab work completed
K-1 Mar-16 15th floor slab work completed
K-2 May-16 17th floor slab work completed
J Apr-16 19th floor slab work completed
H (Albaria) Jul-18 2nd floor slab work completed
A-2X Jul-18 Structure Completed,Finishing Work in progress
A-2Y Jul-18 Structure Completed,Finishing Work in progress
A-2Z Jul-18 18th floor slab work completed
A-3M Jul-18 17th floor slab work completed
A-3N Jul-18 17th floor slab work completed
S-3A Jul-18 Structure Completed,Finishing Work in progress
S-3B Jul-18 Structure Completed,Finishing Work in progress
Enquiry Form
I am interested in this project
spacer
spacer
Location Map
Toll Free 1800 103 7676