I anticipate my cerebration at the time was uk rolex replica that the Black-dialed Submariner was so good, it was traveling to be difficult to replica watches argue consumers to get blooming instead of black, or ask them to get in and buy the two. I aswell wish to point out that fake rolex replica watches while the blooming "Hulk" Rolex Submariner 116610LV is not a bound edition, it is not the blazon of watch that replica rolex Rolex will do forever. Its acceptance has kept it in production, but Rolex could stop accomplishing it in blackout at any time after admonishing or reason.

Home   /   Projects   /   Residential   /   River Crest, Rudrapur
River Crest, Rudrapur
Welcome to River Crest, Rudrapur
Starts From
Rs. 13,16,000
Location
Rudrapur, Pant Nagar ( U.K)
EMI Starts from
Rs. 12,000
Completion Date
Oct-2018


Rudrapur is a growing city in several ways. Many multi-national brands vouch for the place and plan to expand furthermore. The residential sector is also blooming with world-class developments like Supertech RiverCrest, a 24 acre metropolitan township. Come, enjoy riverside living and be surrounded by scenic beauty.


Loans Approved by

 

Features
What's Special

Clubhouse

Coffee Bar

Gymnasium

Parking

Swimming Pool

CCTV Surveillance

Play Area

Hi-speed Elevators

Power Back-up

Open Landscape

Jogging Track

Party Lawn
  • 24 acre luxurious township
  • Pleasant splendors of riverside view
  • Exclusive Club with swimming pool
  • Landscaped greens with water bodies
  • Gated complex with advanced security systems
  • Well-planned roads, paved walkways and tree-lined avenues
  • Underground sewage treatment plant
  • High-end specifications
  • Situated along NH-87
  • Round the clock power back up and water supply
  • Land allotted by SIDCUL Authority
  • Well connected to New Delhi
  • 15 minutes drive from Airport and Railway Station
  • In close proximity to Metropolis Mall, Radisson Blu and Metroplois City
Media Gallery
Get Direction
Site Plan
Roll Over to Enlarge
Floor Plans
1 BHK

Drawing Room
10'-6"x12'-0"

Bedroom Room
10'-0"x10'-6"

Kitchen
5'-0"x7'-0"

1 Bathroom
4'-0"x4'-0"

2 Balconies
5'-0" WD

1 Toilet
4'-0"x4'-0"
Studio 620 sq.ft
Super Area - 620 sq.ft

Living/Bedroom
8'-6" x 9'

Kitchen
8'-6"x 8'

Bedroom
8'6"x 11'9"

1 Toilet
7'-3"x 5'

1 Balcony
12'-5' Wide Balcony
Specifications
Flooring
Marble/tiles in living & dining rooms. Wooden flooring in master bedroom. Vitrified tiles in all the bedrooms. Anti-skid tiles in the balcony.
Wall & Ceiling Finish
POP/Gypsum plaster finished walls & ceiling with OBD.
Kitchen
Marble on the working top & 2' high wall dado.
Toilets
Granite counter washbasin. All toilets will have ceramic floor & wall tiles up to 7" height, balance painted in acrylic emulsion paint. Premium quality sanitaryware. Wall hung WC and washbasin in matching shades/colors. Single lever C.P. fitting. All the toilets will include exhaust fan, mirror, towel rack, rod & ring accessories.
Plumbing
Pressurized water supply system. Copper piping for water supply inside the toilet and kitchen & UPVC pipes for stacks.
Electrical
Modular range switches sockets MCBs, copper wiring. Two wall light fixtures in each living, dining lobby and bedroom area.
Doors and Windows
Main Entrance: 8' high entrance door with polished hardwood frame
Internal Door: Seasoned hardwood frame
Window: UPVC windows
Communication
TV and telephone points
Air Conditioning
Only provision of AC points in bedrooms, drawing & dining area.
Security
Secured gated community
Price List
[A] Construction Link/Special Payment Plan
Category Super Area sq.ft. BSP (Per sq.ft.) Total Cost (in Rupee)
1 BHK 598 2200 1315600
2 BHK 975 2200 2145000
3 BHK 1140 2200 2508000
[B] Down Payment Plan
  Super Area sq.ft. BSP (Per sq.ft.) Total Cost (in Rupee)
1 BHK 598 1980 1184040
2 BHK 975 1980 1930500
3 BHK 1140 1980 2257200
[A] Basic Sales Price
Type Plot Size Covered Area B.S.P
Villa Sq.Yd Sq Ft INR
A 150 1290 4625250
B 200 1485 6090750
C 250 1655 7557500
D 275 2045 8328125
E 325 2300 9790625
[B] Other Charges
Particulars Cost
IFMS Rs. 50 Per Sq.ft.
EDC / IDC Free of Cost
Clup Membership(optional) Rs. 50000 /-
Open car parking Included in BSP
PB/EI/MI (Upto 2 KW & 1) Rs 85000
[C] Preferential Location Charges
Particulars Cost
Corner PLC 5%
Park Facing PLC 5%
Both Corner & park Facing 7.5%
[A] Basic Sales Price
Accommodation Type Down Payment Plan BSP @ Rs. 2676/sq.ft.
Studio (620 sq.ft.) Rs. 1659120
[B] Floor PLC
Ground Floor Rs 125  psf
First floor Rs 100 psf
Second Floor Rs 75 psf
Third Floor Rs 50 psf
Fouth Floor Rs 25 psf
Fifth Floor         NIL 
Sixth Floor         NIL
Cornor PLC Rs 50 psf
[C] Other Charges
Particulars Cost
Open Car Parking Rs 50,000/- (Optional)
Club Membership Rs 50,000/- (Optional)
Interest Free Maintenance Security(IFMS) Rs 50 psf
EDC/IDC Rs 50 psf
Electrical Installation charges ( 2 KVA Mandatory) Rs 40000
Power Back up ( 1 KVA Mandatory) Rs 20000
Payment Plan
[A] Down Payment Plan
   
At The Time Of Booking 10%
With In 45 days of Booking 80%
On Offer of Possession 10%
[B] Special Payment Plan
At The Time Of Booking 10%
With In 45 days of Booking 30%
on 10th floor slab casting 30%
On Offer of Possession 10%
[C] Construction Linked Payment Plan
Particulars Percentage
At the time of booking 2%
Balance of 10% within 20 days 8%
within 45 days of Booking Amount 10%
On the start of Excavation 10%
On the start of casting of 1st floor 10%
On the start of casting of 3rd floor 10%
On the start of casting of 5th floor 10%
On the start of casting of 7th Floor 10%
On the start of casting of 9th floor 10%
On finishing of the tower 10%
On offer of Possession 10%
[D] Additional Charges
   
Electricity installation charges 2 Kva 40000
Power Backup 20000
Club Membership Charge (optional) 50000
Stilled Car Paarking (optional) 200000
[E] Terms and Conditions
  • Cheques/Bank Draft to be issued in favour of 'SUPERTECH LIMITED' Payable at Rudrapur
  • Registration Stamp Duty shall be payable at the time of offer of possession.
  • All buildings plans, layouts, specifications are subject to modification as decided by the competent authority.
  • Timely payments of the installments are the essence of the Agreement.
  • On Delayed Payments Company will charge interest @2% Month for any delayed Period.
  • Service tax, Lease rent and excalation charge will be extra.
  • 1 sq meter = 10.764 sq feet
[A] Down Payment Plan
   
At The Time Of Booking 10%
With In 45 days of Booking 80%
On Offer of Possession 10%
[B] Construction linked payment plan
   
At  The Time Of Booking 10%
With In 45 days of Booking 10%
On commencement of foundation work 10%
On Plinth Level 10%
On The Start of casting of Ground Floor slab 10%
on start of brick work 10%
on start of internal plaster  10%
on start of external plaster  10%
On start of finishing work 10%
On Offer of Possession 10% + Additional Charges
[C] Terms and Conditions
  • Cheques/Bank Draft to be issued in favour of 'SUPERTECH LIMITED' Payable at Rudrapur
  • Registration Stamp Duty & Lease rent shall be payable at the time of offer of possession.
  • All buildings plans, layouts, specifications are subject to changes & modification as per the company, architect or any other competent authority.
  • Timely payments are the essence of the Agreement otherwise Company will charge interest @2% Month
  • Service tax , Maintanence charge will be extra. (1 sq meter = 10.764 sq feet).
Payment Plan
At The Time of Booking  
With In 15 days of Booking  
With In 30 days of Booking  
With In 45 days of Booking  
With In 60 days of Booking  
With In 75 days of Booking  
Terms and conditions
  • Cheques/Bank Draft to be issued in favour of 'SUPERTECH LIMITED' Payable at Rudrapur
  • Registration Stamp Duty shall be payable at the time of offer of possession.
  • All buildings plans, layouts, specifications are subject to modification as decided by the company, architect or competent authority.
  • Timely payments of the installments are the essence of the Agreement.
  • On Delayed Payments Company will charge interest @2% Month for any delayed Period.
  • Service tax , Lease rent and excalation charge will be extra.
  • 1 sq meter = 10.764 sq feet
Progress Status
Tower Possession Date Current Status
Plots Under Offer of Possession Plots Development Completed
1 BHK (Tower – E) Oct 2018 Ground floor slab casting start
Tower F Under Offer of possession Handover
Villa Oct 2017 work on scheduled as per time
Enquiry Form
I am interested in this project
spacer
spacer
Location Map
Toll Free 1800 103 7676