The Golf Country is spread over a vast stretch of 100 acres, and ideally situated on what will soon become the corridors of power, lying as it does on the cusp of the national capital and the fastest growing area surrounding it. The state-of-the art modern golf course is designed to meet international specifications, and the tastes of those travel around the world. And the homes, along with the amenities, are designed with an aim to bring the best of the world home to you.
Playing golf is the privilege of the few and the chosen. Imagine then, living in one. Supertech presents the exclusivity of owning your own home amidst a sprawling golf course in Golf Country. Situated on the rapidly developing Yamuna Expressway, the Golf City is set to be a landmark. And the home of those in power.
The Golf Country is dotted with individual plots set among the scenic golf course. Pick from the few and the exclusive sites to make it your home. Walk out to play a game or just catch the sunrise over the greens. You could also choose from the tasteful villas and highrise apartments. Whatever your heart settles on, in the Golf Country, you will have settled on something special.
Nothing could be better than a home in a Golf Course. But we have tried.
Accomodation Type | Unit Size | Basic Sale Price | Total Price | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
1 BHK | 500 | 46.46 | 3015 | 32441 | 1507500 |
1 BHK | 690 | 64.12 | 3015 | 32441 | 2080350 |
2 BHK | 810 | 75.27 | 3015 | 32441 | 2442150 |
2 BHK | 1000 | 92.93 | 3015 | 32441 | 3015000 |
2 BHK + Study | 1255 | 116.63 | 3015 | 32441 | 3783825 |
3 BHK | 1440 | 133.82 | 3015 | 32441 | 4341600 |
Accomodation Type | Unit Size | Basic Sale Price | Total Price | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
1 BHK | 500 | 46.46 | 3182 | 34238 | 1591000 |
1 BHK | 690 | 64.12 | 3182 | 34238 | 2195580 |
2 BHK | 810 | 75.27 | 3182 | 34238 | 2577420 |
2 BHK | 1000 | 92.93 | 3182 | 34238 | 3182000 |
2 BHK + Study | 1255 | 116.63 | 3182 | 34238 | 3993410 |
3 BHK | 1440 | 133.82 | 3182 | 34238 | 4582080 |
Accomodation Type | Unit Size | Basic Sale Price | Total Price | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
1 BHK | 500 | 46.46 | 3350 | 36046 | 1675000 |
1 BHK | 690 | 64.12 | 3350 | 36046 | 2311500 |
2 BHK | 810 | 75.27 | 3350 | 36046 | 2713500 |
2 BHK | 1000 | 92.93 | 3350 | 36046 | 3350000 |
2 BHK + Study | 1255 | 116.63 | 3350 | 36046 | 4204250 |
3 BHK | 1440 | 133.82 | 3350 | 36046 | 4824000 |
Location | Cost per. Sq.Ft. |
Ground | Rs. 120 |
1st Floor | Rs. 110 |
2nd Floor | Rs. 100 |
3rd Floor | Rs. 90 |
4th Floor | Rs. 80 |
5th Floor | Rs. 70 |
6th Floor | Rs. 60 |
7th Floor | Rs. 50 |
8th Floor | Rs. 40 |
9th Floor | Rs. 30 |
10th Floor | Rs. 20 |
11th Floor | Rs. 10 |
Park / Road Facing | Rs. 25 |
Corner Apartment | Rs. 25 |
Particulars | Cost |
IFMS | Rs. 50 per sq.ft.(538 sq.mt.) |
One Time Lease Rent | Rs. 85 per sq.ft. (914.6 sq.mt.) |
Club Membership | Rs. 1,00,000 |
Covered Car Parking | Rs. 3,00,000 |
Electricity Installation Charges | Rs. 20,000 per KVA (2 KVA Mandatory) |
Power Backup | Rs. 20,000 per KVA (1 KVA Mandatory) |
External Development Charges (EDC) | Rs. 125 per sq.ft.(1345 sq.mt.) |
Accomodation Type | Unit Size | Basic Sale Price | Total Price | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
1 BHK | 590 | 54.81 | 3465 | 37297 | 2044350 |
Accomodation Type | Unit Size | Basic Sale Price | Total Price | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
1 BHK | 590 | 54.81 | 3657 | 39364 | 2157630 |
Accomodation Type | Unit Size | Basic Sale Price | Total Price | ||
in sq.ft. | in sq.mt. | per sq.ft. | per sq.mt. | ||
1 BHK | 590 | 54.81 | 3850 | 41441 | 2271500 |
Particulars | Cost |
IFMS | Rs. 50 per sq.ft. |
Lease Rent | Rs. 85 per sq.ft. |
Club Membership | Rs. 1,00,000 |
Covered Car Parking | Rs. 3,00,000 (Optional) |
Electricity Installation Charges | Rs. 20,000 per KVA (2 KVA Mandatory) |
Power Backup | Rs. 20,000 per KVA (1 KVA Mandatory) |
External Development Charges (EDC) | Rs. 125 per sq.ft. |
Location | Cost per sq.ft. |
Ground | Rs. 120 |
1st Floor | Rs. 110 |
2nd Floor | Rs. 100 |
3rd Floor | Rs. 90 |
4th Floor | Rs. 80 |
5th Floor | Rs. 70 |
6th Floor | Rs. 60 |
7th Floor | Rs. 50 |
8th Floor | Rs. 40 |
9th Floor | Rs. 30 |
10th Floor | Rs. 20 |
11th Floor | Rs. 10 |
16th Floor | Rs. 10 |
17th Floor | Rs. 20 |
18th Floor | Rs. 30 |
19th Floor | Rs. 50 |
Corner | Rs. 25 |
Park Facing | Rs. 25 |
Road Facing | Rs. 25 |
Plot Size | Built-up Area | DPP | Flexi | CLP |
100 sq.yds. (83.61 sq.mt.) | 2606 sq.ft. | Rs. 8443460 | Rs. 8912520 | Rs. 9381600 |
150 sq.yds. (125.41 sq.mt.) | 3925 sq.ft. | Rs. 12717000 | Rs. 13423500 | Rs. 14130000 |
200 sq.yds. (167.22 sq.mt.) | 4704 sq.ft. | Rs. 16934400 | Rs. 17875200 | Rs. 18816000 |
325 sq.yds. (273.1 sq.mt.) | 6260 sq.ft. | Rs. 23662800 | Rs. 24977400 | Rs. 26292000 |
Particulars | Cost |
IFMS | Rs. 50 per sq.ft. |
Lease Rent | Rs. 85 per sq.ft. |
Club Membership | Rs.2,00,000 |
Golf Membership (Optional) | Rs. 3,00,000 |
Electricity Installation Charges | Rs. 20,000 per KVA (2 KVA Mandatory) |
Power Backup | Rs. 20,000 per KVA (1 KVA Mandatory) |
EDC / IDC Charges | Rs. 125 per sq.ft. |
Location | Cost |
Corner | 10% of Basic Cost |
Park Facing | 10% of Basic Cost |
2 PLCs | 15% of Basic Cost |
Area 100 Sq. Yds. | |
Basic Parameters | Special payment plan |
Base Rate | Rs. 32000/ sq. yds (Rs. 38,400/ sq. mt) |
Area (Sq. Yds.) | 100 |
Base Cost Rs. | 32,00,000 |
Area 150 Sq. Yds. | |
Basic Parameters | Special payment plan |
Base Rate | Rs. 32000/ sq. yds (Rs. 38,400/ sq. mt) |
Area (Sq. Yds.) | 150 |
Base Cost Rs. | 48,00,000 |
Area 200 Sq. Yds. | |
Basic Parameters | Special payment plan |
Base Rate | Rs. 32000/ sq. yds (Rs. 38,400/ sq. mt) |
Area (Sq. Yds.) | 200 |
Base Cost Rs. | 64,00,000 |
Area400 Sq. Yds. | |
Basic Parameters | Special payment plan |
Base Rate | Rs. 32000/ sq. yds (Rs. 38,400/ sq. mt) |
Area (Sq. Yds.) | 400 |
Base Cost Rs. | 12800000 |
Particulars for Apartment | RS. |
IDC / EDC | Rs.900/- sq. yds.(1080/ sq. mt.) |
Electric Substation | Rs.500/- sq. yds. (600/sq. mt.) |
Lease | RS.600 /- sq. yds. (720/ sq. mt.) |
IFMS | Rs.500/- sq. yds. (600/sq. mt.) |
Club Membership | Rs.200000/- |
Golf Course membership (optional) | Rs.500000/- |
Location PLC Independent Plots | Rs. |
Park Facing | 10% Corner |
Corner Plots | 10% Park Facing |
Sr. No. | Particulars | Percentage |
1. | At the time of booking | 10% |
2. | Within 30 days from booking | 85% |
3. | On offer of possession | 05% |
Sr. No. | Particulars | Percentage |
1. | At the time of booking | 10% |
2. | Within 60 days of booking | 40% |
3. | On start of foundation work | 09% |
4. | On start of basement roof slab | 09% |
5. | On start of Second floor roof slab | 09% |
6. | On start of Sixth floor slab | 09% |
7. | On start of Twelve floor roof slab | 09% |
8. | On offer of Possession Letter | 05% |
Sr. No. | Particulars | Percentage |
1. | At the time of booking | 10% |
2. | Within 30 days of booking | 10% |
3. | Within 60 days of booking | 10% |
4. | On Start of foundation work | 10% |
5. | On Start of basement roof slab | 07% |
6. | On Start of second floor roof slab | 07% |
7. | On Start of fifth floor roof slab | 07% |
8. | On Start of eighth floor roof slab | 07% |
9. | On Start of twelfth floor roof slab | 06% |
10. | On Start of fourteen floor roof slab | 06% |
11. | On Start of sixteen floor roof slab | 05% |
12. | On Start of eighteen floor roof slab | 05% |
13. | On Start of ninetieth floor roof slab | 05% |
14. | On offer of Possession | 05% |
1. | Unit allotment on first come first serve basic |
2. | Cheques/Bank Draft to be issued in favour of 'SUPERTECH TOWNSHIP PROJECT LIMITED' Payable at New Delhi. Out station cheques shall not be accepted. |
3. | Price List as on date of Booking shall be applicable |
4. | Registration, Stamp Duty and Misl. charges shall be payable at the time of offer of possession. |
5. | Timely payments of the installments are the essence of Booking |
6. | PLCs and Other Charges shall be charged along with installments. |
7. | Service Tax, VAT & Other Govt. Levies are extra as applicable. |
8. | This Price List supersedes all previous Price Lists |
9. | Maintenance Charges. Meter connection Charges are extra and shall be collected before Possession. |
10. | Super area includes the covered area, plus the proportionate area under common corridor, passage, staircase, mumties, projections, water tanks, lift wells etc |
11. | The terms and conditions of sale stated herein are indicative and are subject to detailed terms and conditions in the Agreement to Sell/Flay BuyerAgreement and subject to change at sole discretion of the company. |
12. | All buildings plans, layouts, specifications are subject to change and modifications as decided by the company, architect or any competent authority. |
Sr. No. | Particulars | Percentage |
1. | At the time of booking | 10% |
2. | Within 30 days from booking | 85% |
3. | On offer of possession | 05% |
Sr. No. | Particulars | Percentage |
1. | At the time of booking | 10% |
2. | Within 60 days of booking | 40% |
3. | On start of foundation work | 09% |
4. | On start of basement roof slab | 09% |
5. | On start of Second floor roof slab | 09% |
6. | On start of Sixth floor slab | 09% |
7. | On start of Twelve floor roof slab | 09% |
8. | On offer of Possession Letter | 05% |
Sr. No. | Particulars | Percentage |
1. | At the time of booking | 10% |
2. | Within 30 days of booking | 10% |
3. | Within 60 days of booking | 10% |
4. | On Start of foundation work | 10% |
5. | On Start of basement roof slab | 07% |
6. | On Start of second floor roof slab | 07% |
7. | On Start of fifth floor roof slab | 07% |
8. | On Start of eighth floor roof slab | 07% |
9. | On Start of twelfth floor roof slab | 06% |
10. | On Start of fourteen floor roof slab | 06% |
11. | On Start of sixteen floor roof slab | 05% |
12. | On Start of eighteen floor roof slab | 05% |
13. | On Start of ninetieth floor roof slab | 05% |
14. | On offer of Possession | 05% |
1. | Unit allotment on first come first serve basic |
2. | Cheques/Bank Draft to be issued in favour of 'SUPERTECH TOWNSHIP PROJECT LIMITED' Payable at New Delhi. Out station cheques shall not be accepted. |
3. | Price List as on date of Booking shall be applicable |
4. | Registration, Stamp Duty and Misl. charges shall be payable at the time of offer of possession. |
5. | Timely payments of the installments are the essence of Booking |
6. | PLCs and Other Charges shall be charged along with installments. |
7. | Service Tax ,VAT & Other Govt. Levies are extra as applicable. |
8. | This Price List supersedes all previous Price Lists |
9. | Maintenance Charges. Meter connection Charges are extra and shall be collected before Possession. |
10. | Super area includes the covered area, plus the proportionate area under common corridor, passage, staircase, mumties, projections, water tanks, lift wells etc |
11. | The terms and conditions of sale stated herein are indicative and are subject to detailed terms and conditions in the Agreement to Sell/Flay BuyerAgreement and subject to change at sole discretion of the company. |
12. | All buildings plans, layouts, specifications are subject to change and modifications as decided by the company, architect or any competent authority. |
Sr. No. | Particulars | Percentage |
1 | At the time of booking | 25% |
2 | At the time of possession | 75% |
Particulars for Apartment | RS. |
IDC / EDC | Rs.900/- sq. yds.(1080/ sq. mt.) |
Electric Substation | Rs.500/- sq. yds. (600/sq. mt.) |
Lease | RS.600 /- sq. yds. (720/ sq. mt.) |
IFMS | Rs.500/- sq. yds. (600/sq. mt.) |
Club Membership | Rs.200000/- |
Golf Course membership (optional) | Rs.500000/- |
Location PLC Independent Plots | Rs. |
Park Facing | 10% Corner |
Corner Plots | 10% Park Facing |
1. | Price list as on date of booking shall be applicable. |
2. | PLCs if any shall be charged along with installments towards basic cost. |
3. | Cheques/Bank Drafts to be issued in favor of 'SUPERTECH TOWNSHIP PROJECT LIMITED' payable at New Delhi/Noida. Out station cheques shall not be accepted. |
4. | Additional electricity charges, meter connection charges, maintenance and other charges are extra and shall be collected before the possession. |
5. | Service tax, VAT & other government levies are extra, as applicable. |
6. | Registration, Stamp Duty and misc. charges shall be payable at the time of Offer of Possession. |
7. | Super Area includes the covered area plus the proportionate area under Common Corridor, Passages, Staircases, Mumties, Projections, Water Tanks, Lift Wells |
8. | The terms and condition of sale stated herein are indicative and are subject to detailed terms & conditions in the 'Agreement to Sell1 / flat Buyer's Agreement1 and are subject to change at |
9. | sole discretion of the company. |
10. | Timely payments of the installments is the essence of the Booking. |
11. | This Price List supercedes all previous price lists. |
Sr. No. | Particulars | Percentage |
1. | At the time of booking | 10% |
2. | Within 60 days of booking | 85% |
3. | On Offer Of Possession Letter | 05% |
Sr. No. | Particulars | Percentage |
1. | At the time of booking | 10% |
2. | Within 30 days of booking | 35% |
3. | On start of foundation work | 10% |
4. | On start of ground floor roof slab | 10% |
5. | On start of first floor roof slab | 10% |
6. | On start of Internal brick work | 10% |
7. | On start of Internal Plaster | 10% |
8. | On offer of Possession Letter | 05% |
Sr. No. | Particulars | Percentage |
1. | At the time of booking | 10% |
2. | Within 60 days of booking | 10% |
3. | Within 120 days of booking | 10% |
4. | On Start of foundation work | 15% |
5. | On Start of Ground Floor roof slab | 15% |
6. | On Start of first Floor roof slab | 15% |
7. | On Start of Internal brick work | 10% |
8. | On Start of Internal Plaster | 10% |
9. | On offer of possession Letter | 05% |
Tower | Possession Date | Current Status |
B-01 to B-26 (100 Sq yd) | Possessions Started | Possessions Started |
B-27 to B-53 (100 Sq yd) | Possessions Started | Possessions Started |
B-55 to B-78 (100 Sq yd) | Possessions Started | Possessions Started |
B-79 to B-100 (100 Sq yd) | Possessions Started | Possessions Started |
B-101 to B-122 (100 Sq yd) | Possessions Started | Possessions Started |
B-123 to B-159 (100 Sq yd) | Possessions Started | Possessions Started |
B-176 to B-192 (100 Sq yd) | Possessions Started | Possessions Started |
B-193 to B-209 (100 Sq yd) | Possessions Started | Possessions Started |
B-54 (100 Sq yd) | Possessions Started | Possessions Started |
B 160 to B 174 (100 Sq yd) | Possessions Started | Possessions Started |
B 175 (100 Sq yd) | Possessions Started | Possessions Started |
B 210 (100 Sq yd) | Possessions Started | Possessions Started |
A-1 to A-26 (150 Sq yd) | Possessions Started | Possessions Started |
A1-33 to A1-55 (150 Sq yd) | Possessions Started | Possessions Started |
A1-27 to A1-32 (150 Sq yd) | Possessions Started | Possessions Started |
D1-01 to D1-14 (200 Sq yd) | Possessions Started | Possessions Started |
D1-17 to D1-30 (200 Sq yd) | Possessions Started | Possessions Started |
D1-15 to D1-16 (200 Sq yd) | Possessions Started | Possessions Started |
A2-01 to 16 (200 Sq yd) | Possessions Started | Possessions Started |
D2-01 to D2-14 (200 Sq yd) | Possessions Started | Possessions Started |
J-1 to J-10 (400 Sq yd) | Possessions Started | Possessions Started |
Tower | Possession Date | Current Status |
C-4 | Oct-17 | Structure completed, finishing work started |
B-1 A | Oct-17 | Structure completed, finishing work started |
B-1 B | Mar-18 | 10th Floor work completed |
C-5 | Oct-17 | Structure completed, finishing work started |
C-1 | Mar-18 | 17th Work in Progress |
C-2 | Mar-18 | 11th floor work in Progress |
C-3 | Mar-18 | 15th floor work in Progress |
D-1 | Jan-19 | Podium-2 work in progress |
E-1 | Dec-18 | Ground Floor work in progress |
E-2 | Sep-18 | 1st floor work in progress |
A-1 | Jun-18 | 6th floor work in progress |
A-2 | Jun-18 | 3rd floor work in progress |
A-3 | Sep-18 | Ground floor slab completed |
W | Feb-19 | Podium-2 work in progress |
W1 | Mar-19 | Podium-2 work in progress |
W2 | Apr-19 | Basement work in progress |
U1 | Jun-19 | |
U2 | Jun-19 |
Tower | Possession Date | Current Status |
G1-1 to 9 (150 sq yard) | Oct-17 | Internal finishing in progress |
G1-10 to 22 (150 sq yard) | Oct-17 | Internal finishing in progress |
G1-23 to 35 (150 sq yard) | Oct-17 | Internal finishing in progress |
G1-36 to 48 (150 sq yard) | Oct-17 | Internal finishing in progress |
F1-1 to 18 (100sq yard) | Oct-17 | |
F1-19 to 27 (100sq yard) | Oct-17 | Internal finishing in progress |
F1-34 to 42 (100sq yard) | Oct-17 | Internal finishing in progress |
F1-43 to 61 (100sq yard) | Oct-17 | Internal finishing in progress |
F1-62 to 82 (100sq yard) | Oct-17 | Internal finishing in progress |
F1-83 to 90 (100sq yard) | Oct-17 | Internal finishing in progress |
C1-11 TO C1-14 (200sq yard) | Mar-18 | Second floor work in progress |
C1-15 TO C1-20 (200sq yard) | Oct-17 | Second floor work in progress |
C1-21 TO C1-32 (200sq yard) | Oct-17 | Second floor work in progress |
C1-33 TO C1-39 (200sq yard) | Oct-17 | Second floor work in progress |
K-12A to K-22 (325sq yard) | Mar-18 | Finishing in Progress |
Main Gate | ---- | Done |
Disney Gate | ---- | Finishing in Progress |